As we all know, a port 40 tons of portal crane installation is very complicated and trouble, so every time after installed, all need to boot on a trial basis, only tried the machine has been successfully installed, and the function normal operation after, can really into the production process, and determine whether the machine can be used formally, you can see the following points.
First see oil circulation and observe the machine motor, tubing, lubrication parts, bearings with and without oil leakage phenomenon, such as sealing parts to see if there is oil drip out of, etc., to ensure that the intact the sealing performance of the machine is very important, this is the most basic, at the same time is also relatively easy to observe, see if there is any oil leakage.
Secondly, we need to observe the belt of the port's 40-ton gantry crane in the operating state. If we want to put it into production and use formally, we must ensure the smooth and smooth operation of the belt. In the process, there should be no deviation, turnover, skidding or stuck.
Pay attention to these conditions, can make the port 40 tons gantry crane to get a better installation, and can be used in the formal, can effectively play the power and effect of the equipment, and not because the inspection is not in place to appear all kinds of accidents and so on.
- What does the working speed of port 40 ton gantry crane include
- What factors are related to the hoisting of wharf fixed cranes
- The scope of application of large Marine floating crane
- Can the port 40 ton gantry crane be used in rainy weather